政府新闻

City News

沪苏湖铁路全线箱梁架设完成   2024-03-06

 


Installation of box griders along the Shanghai-Suzhou-Huzhou high-speed railway is completed on the dawn of March 4 in Shanghai's Songjiang district. 

The full installation of all box girders along the Shanghai-Suzhou-Huzhou high-speed railway line was finished on March 4, with the last box girder placed on a mega bridge pier in Shanghai's Songjiang district.

Stretching 163.8 km from Shanghai Hongqiao Railway Station to Huzhou Railway Station in Zhejiang province via Suzhou in Jiangsu province, the new high-speed rail line features a design speed of 350 km/h. It includes eight railway stations along its route.

Once operational, the new railway is expected to play a significant role in the integrated development of the Yangtze River Delta region by enhancing transportation links between major cities.

The Songjiang east precast beam plant under the China Railway First Group is responsible for fabricating and erecting the 443 box girders spanning from Songjiang South Railway Station to Shanghai Hongqiao Railway Station. Girder production began on June 11, 2022, and installation commenced on April 24, 2023.









Source: China Daily

 


注册记者登录

 

 

记者点此免费注册 | 忘记密码

采访申请流程

06月08日 21315203 受理中
02月16日 21315167 已办结
01月26日 21315166 已办结

咨询申请流程

06月12日 02131545 已办结
05月12日 02131544 已办结
05月06日 02131541 已办结

查看全部 »

共性问题提示

Q: 问:如果想要迅速了解上海这座...
A: 答:请注册登陆本网站“今日上...
Q: 问:如果您想在上海进行采访,...
A: 答:(1) 请注册登陆本网站...
Q: 在哪里可以买到上海的地图?
A: 上海各大书店中均有出售,一些...