政府新闻
虹桥机场1号航站楼A楼正式启用 实现通关提速 2017-03-27
HONGQIAO International Airport check-in and security checks were faster at the newly renovated Building A terminal that opened yesterday.
Passengers, however, are still advised to arrive early at the airport until the system beds down.
All domestic and international flights at T1 of the Hongqiao airport have been moved to Building A, while the old Building B at T1 is closed for reconstruction.