Government News
New terminal at Hongqiao makes flying less hassle 2017-03-27
HONGQIAO International Airport check-in and security checks were faster at the newly renovated Building A terminal that opened yesterday.
Passengers, however, are still advised to arrive early at the airport until the system beds down.
All domestic and international flights at T1 of the Hongqiao airport have been moved to Building A, while the old Building B at T1 is closed for reconstruction.
Passengers, however, are still advised to arrive early at the airport until the system beds down.
All domestic and international flights at T1 of the Hongqiao airport have been moved to Building A, while the old Building B at T1 is closed for reconstruction.
Application Status
04-16 | 21315227 | Processing |
03-12 | 21315226 | Processing |
09-26 | 21315225 | Processing |
Inquiry Status
02-29 | 02131558 | Received |
03-06 | 02131557 | Received |
11-14 | 02131556 | Received |
FAQ
Q: Q: Is there a place where I can get...
A: A: Log on to http://touch.shio.gov....
A: A: Log on to http://touch.shio.gov....
Q: Q: What is the easiest way to set u...
A: A: 1. Log on to http://touch.shio.g...
A: A: 1. Log on to http://touch.shio.g...
Q: Where can I get an English map of S...
A: English maps of Shanghai are availa...
A: English maps of Shanghai are availa...