Government News
Work begins on S26 expressway section using innovative method 2017-08-03
MAJOR construction started yesterday on a new elevated expressway to link the Hongqiao Central Business District and National Exhibition and Convention Center with downtown, as well as to help relieve traffic congestion in north Shanghai.
It also marks the first overall application of the “prefabricated method” on a single urban construction project in the city, which is being widely promoted to cut air pollution and noise during construction, the Shanghai Transport Commission said.
A crane lifted a 9-meter-tall concrete pillar for the “entry section” of the S26 Expressway into position at the construction site on Jidi Road in Minhang District, while workers assembled the 95-ton supportive pillar onto the foundation work.
It also marks the first overall application of the “prefabricated method” on a single urban construction project in the city, which is being widely promoted to cut air pollution and noise during construction, the Shanghai Transport Commission said.
A crane lifted a 9-meter-tall concrete pillar for the “entry section” of the S26 Expressway into position at the construction site on Jidi Road in Minhang District, while workers assembled the 95-ton supportive pillar onto the foundation work.
Application Status
04-16 | 21315227 | Processing |
03-12 | 21315226 | Processing |
09-26 | 21315225 | Processing |
Inquiry Status
02-29 | 02131558 | Received |
03-06 | 02131557 | Received |
11-14 | 02131556 | Received |
FAQ
Q: Q: Is there a place where I can get...
A: A: Log on to http://touch.shio.gov....
A: A: Log on to http://touch.shio.gov....
Q: Q: What is the easiest way to set u...
A: A: 1. Log on to http://touch.shio.g...
A: A: 1. Log on to http://touch.shio.g...
Q: Where can I get an English map of S...
A: English maps of Shanghai are availa...
A: English maps of Shanghai are availa...