Government News
Work to start this year on 3rd phase of Line 13 2014-05-30
CONSTRUCTION work on the third phase of Metro Line 13 will start this year after getting environmental clearance.
The third phase will have three stations — Zhongke, Xuelin and Zhangjiang roads — and go past ShanghaiTech University and the Zhangjiang High-tech Park. Work is expected to be completed by 2017.
Currently, Line 13 operates from Jinyun Road Station in Jiading District and connects to Line 3 and 4 at Jinshajiang Road. The first phase of Line 13 was expected to connect Jiading District to Nanjing Road W. Station in downtown Jing’an District. But much of it is still under construction, as is the southeast-bound second phase, which goes under the Huangpu River before reaching Huaxia Road M. Station in Pudong.
The third phase will have three stations — Zhongke, Xuelin and Zhangjiang roads — and go past ShanghaiTech University and the Zhangjiang High-tech Park. Work is expected to be completed by 2017.
Currently, Line 13 operates from Jinyun Road Station in Jiading District and connects to Line 3 and 4 at Jinshajiang Road. The first phase of Line 13 was expected to connect Jiading District to Nanjing Road W. Station in downtown Jing’an District. But much of it is still under construction, as is the southeast-bound second phase, which goes under the Huangpu River before reaching Huaxia Road M. Station in Pudong.
Application Status
04-16 | 21315227 | Processing |
03-12 | 21315226 | Processing |
09-26 | 21315225 | Processing |
Inquiry Status
02-29 | 02131558 | Received |
03-06 | 02131557 | Received |
11-14 | 02131556 | Received |
FAQ
Q: Q: Is there a place where I can get...
A: A: Log on to http://touch.shio.gov....
A: A: Log on to http://touch.shio.gov....
Q: Q: What is the easiest way to set u...
A: A: 1. Log on to http://touch.shio.g...
A: A: 1. Log on to http://touch.shio.g...
Q: Where can I get an English map of S...
A: English maps of Shanghai are availa...
A: English maps of Shanghai are availa...