Government News

Shanghai Daily News Digest

Pujiang Line to open after Spring Festival   2018-01-31

 

 

Shanghai's Metro operator said that the Pujiang Line will be in service after the Spring Festival.

The line starts from Shendu Highway Station and ends at Huizhen Road in Minhang District and will benefit residents living in Pujiang Town but work in downtown. It has six elevated stations and covers a length of 6.8 kilometers. Passengers can change to Line 8 at Shendu Highway Station.

Pujiang Line will be run on APM (automatic people mover) — the first in Shanghai — and does not require a driver during operation. It is also the first Metro line in Shanghai to use rubber tire, which is used on aircraft, to reduce noise.

 


Sign in

 

 

Free sign-up | Forgot password

Application Status

04-16 21315227 Processing
03-12 21315226 Processing
09-26 21315225 Processing

Inquiry Status

02-29 02131558 Received
03-06 02131557 Received
11-14 02131556 Received

view more »

FAQ

Q: Q: Is there a place where I can get...
A: A: Log on to http://touch.shio.gov....
Q: Q: What is the easiest way to set u...
A: A: 1. Log on to http://touch.shio.g...
Q: Where can I get an English map of S...
A: English maps of Shanghai are availa...